Exterior project planner
Pick the condition of your roof, gutters, siding and windows. The planner sorts the work into the order that protects the house and avoids paying for anything twice.

Why the order of exterior work matters
Water moves from the top of the house down, and so should the work. The roof sheds water into the gutters, the gutters carry it away from the siding and the foundation, and the siding and windows keep it out of the walls. Fixing something lower first risks damaging it when the work above is done.
The planner applies that rule to the conditions you choose, then moves anything that is actively failing or storm damaged to the front of the line.
When to break the rule
A leak always comes first, wherever it is. If a window is letting water into the wall, it gets sealed before a cosmetic roof upgrade. And when the roof and siding both need replacing, doing them in the same season saves a second round of ladders, dumpsters and trim work.
Plan your exterior work
Questions
Should the roof always be replaced before new siding?
In most cases, yes. A roof tear-off drops debris and ladders against the walls, and the new drip edge and flashing tie into the siding trim. Doing the roof first means the new siding is installed once against finished edges. The exception is siding that is actively letting water into the walls.
Can gutters go on before the roof is replaced?
They can, but it is rarely worth it. The roof crew often has to remove or bend gutters to install drip edge and starter, so new gutters hung first may come down again. If gutters are failing badly now, a repair can hold them until the roof is done.
What if a storm damaged everything at once?
Have the whole exterior inspected in one visit so every elevation is photographed and documented together. That gives you one clear picture of the damage for a claim, and it lets the work be scheduled roof first, then gutters, then siding and windows.